Completed Pojects

Completed Pojects

 

COMPETED PROJECTS TABLE

#

Clint

Region

Details

Year

1

Niko Resources Ltd

KRG

Construction of a 3.5 “Pipeline of 3.6 KM length in a challenging terrain with all pumping station and installations. This pipeline was built in just over 28 days of work. Pipe used was threaded pipe but involved many days of work involving welding and fabrication. Project completed within budget and time frame.

February 2010

2

Heritage Oil

KRG

Construction of Well Testing Facility (WTF) in Miran West block that included but not limited to complete installation of Test Facility and all fabrication, installation, construction and testing of pipeline. Construction and fabrication of flare lines both for Gas and Oil. Local resources were used 100% in this project.

November 2010

3

Heritage Oil

KRG

Cutting, fabrication, installation of 36” conductor pipe works for the well at Miran West-3 well site. Including supply of structural materials for this job.

June 2011

4

OMV

KRG

Design and Construction of 5 – 400 bbl UBD tanks for Bina Bawi-1 location. Fabrication and construction of all pipe fittings and welding and complete turnkey project. Supply and install 30 meters of 4” schedule D steel pipe, fabrication of materials and structural basis for pipe and pumps.

December 2010

5

OMV

KRG

Supply and Installation of 2” 8 pass coded welded steel pipe coil within UBD tanks with compensation pada and regulating valves on the flow and return.

February 2011

6

OMV

KRG

Supply of all pipeline and fabrication materials for drilling crew rig and Wellsite for setting up facility and repair works on the rig involving pressurized welded work.

March 2011

7

Western Zagros

KRG

Cutting, fabrication, installation of 36” conductor pipe works for the well at Qulijan – 1 well site. Including supply of structural materials for this job.

June    2011

8

OMV

KRG

Supply, Fabrication and Installation of 4” fire Main Extension and supply of 4” materials. Fabrication and installation of Flare Pit Steel Wall, and Mechanical welding works for UBD tank.  Various other pipe works.  J/V with PES Phoenix.

August 2011

9

Ala’adeen Drilling/ OMV

KRG

Repairs and pressurized welding works on the rig on various occasions and all X-ray, NDT involving safety and weld certificates.

July      2011

10

Viking Driling / WZ

KRG

Repairs and pressurized welding works on the rig on various occasions and all X-ray, NDT involving safety and weld certificates.

September 2011

11

Western Zagros

KRG

Sarqala -1 Extended well test Pilot Facility. Providing materials, labour, crews, equipment and life support to execute installation of piping to tie in the following surface facilities -1  choke manifold, 2 separators, 1 surge tank, 1 flare stack, 5 – 400 bbl tanks, 2 loading pumps and 2 loading arm gantry’s. J/V with PES Phoenix.

August – October 2011

12

Various clients

KRG

Many other small jobs for various clients in KRG in 2010 and 2012. We have a professional designers, fabricators, project managers, certified welders that are ready to work on any project.

Present

History of work for Kelkan installation of conductor pipes:

 

#

Clint

Region

Details

Year

1

Kalegran Limited(MOL )

KRG

Installation of 9m depth conductor pipe, including concrete around the pipe.  Excavation done by hand not Auger.

April 2009

2

Niko Resources Kurdistan Limited

KRG

Installation of the conductor pipe to a depth of 18m at block 10 Qaradagh-1 rig site.  An Auger machine was used to drill in the mountain of Qaradagh.  This was drilled in a rocky area. The installation included Welding of the pipe joint each pipe was 9m, pad-eye welding, cutting the pipe, lifting the pipes using  two 50 ton cranes, leveling the pipe and pouring cement &grout mixture around the pipe.

February 2010

3

 Western Zagros Limited

KRG

Installation of a conductor pipe 36” at K44 Qulijan-1 rig site using Auger machine.  This was the second installation for Kelkan. The installation included Welding of the pipe joint each pipe was 9m, pad-eye welding, cutting the pipe, lifting the pipes using  two 50 ton cranes, leveling the pipe and pouring cement &grout mixture around the pipe.

April  2011

4

Forbs Manhattan

KRG

Chia Surch well site, where the installation was up to 21m depth By the Auger machine.  The work included welding, cutting the pipe and installation of 18m of 36”conductor pipe. The installation included Welding of the pipe joint each pipe was 9m, pad-eye welding, cutting the pipe, lifting the pipes using  two 50 ton cranes, leveling the pipe and pouring cement &grout mixture around the pipe.

February 2011

5

Talisman Energy Kurdistan

KRG

K44 block, where 30m depth installation by Auger machine.   The installation included Welding of the pipe joint each pipe was 9m, pad-eye welding, cutting the pipe, lifting the pipes using  two 50 ton cranes, leveling the pipe and pouring cement &grout mixture around the pipe.

April 2011

6

Heritage Energy Middle East

KRG

Drilled up to 29 m depth using Auger machine, The installation included Welding of the pipe joint each pipe was 9m, pad-eye welding, cutting the pipe, lifting the pipes using  two 50 ton cranes, leveling the pipe and pouring cement &grout mixture around the pipe.

April  2011

7

Talisman Energy Kurdistan

KRG

K9 block, where 31m depth installation with all work involved.  The auger machine drilled the depth in 3 hours and the whole work was completed in one day.

October 2011

8

Oil Search  Taza 1

KRG

Wilding off 2 Join Pipe 30ˮ outside diameter length 36m Conductor Pipe.

April 2012

9

Heritage Energy MW5

KRG

Installation of extra Conductor pipe 32ˮ outside diameter (11m Extra) in Miran West Block.

June 2012